Tiled wall or floor of a room should not be a difficult task. In all cases, the most difficult step is to put tiles and align perfectly to a serious tile level. To do this, the first thing to do is draw a vertical axis on the wall and go through it with another horizontal line. The first tile to be placed in the angle formed by the two axes of the tile level and then paste the following to complete the first row. Leaving the same space between the spreaders are very useful for the tile level: small plastic plugs in a cross that is placed between the parties and are deleted when the glue is dry.

The application can be used to allow the same space during the tile level process, it is a significant step in the leveling system between tiles. to place a row of tiles that are not aligned. In all cases, the best thing is to start working on the corners, but reserve the cut pieces to these areas because they are smaller. You should not stick a wall surface. It is best to spread the cement into smaller areas, if I had to correct imperfections. Moreover, in this way, it prevents the glue or cement to dry before placing the tiles.

Senior, the following are placed following the example of the previous row line. So to completely cover the surface. Typically, only the wall of the glue, but it can also be applied on the tiles to improve adhesion. Finally, to finish the job in difficult areas such as edges and corners, cut the tiles with a tile cutter and fill the joints with a special mass.

Prepare the walls and floor with the tile level

Before any wall or floor make sure that the surface is perfectly smooth and dry before the tile level process. If further tiles or old tiles must be removed carefully to avoid damage to the wall. It is advisable to first scrape glue that is on the boards, then remove the pieces. You can also place new tiles on a tiled wall, although it is helpful if the wall was sandblasted old previously for better grip and always the risk that the wall does not support the weight of the new tile tracks.

If the wall is papered should also remove the paper during the tile level process.

Before we must ensure that the entire wall or tile surface is perfectly smooth and dry. Also, if there are cracks, holes or other imperfections need repair before tiling. Cracks must be completely sealed to prevent or get older water leaks through occurs. Indeed, because of the cracking is moisture, so it is advisable to apply a product that neutralizes its effects.

In addition, it is appropriate to set the lowest or damaged parts because they could not bear the burden of new tiles. Before working on a surface must be in perfect condition. There are specific materials to cure the wall and the floor, as well as to level the two surfaces during the tile level process